Policy/Milestone

ISO Policy

ISO 9001:2015 Quality Policy

Crystal View Windows and Doors Co., Ltd. is determined to create satisfaction to our customers by continuously developing the quality products, increasing the capabilities of our personnel and technological resources in order to increase the customer satisfaction.

In order to achieve the quality policy as mentioned above, we will process as following below;
  1. Manufacture the quality products in accordance with our customer’s requirement.
  2. Deliver our finished products to our customers promptly.
  3. Develop the capability of our personnel in order that their knowledge and skills sufficiently to their operation.
  4. Continuously improve the quality management system
  5. Comply with laws, rules, and regulations regarding to the products and ISO 9001:2008 requirements
  6. Build good relationship with our suppliers efficiently to ensure that the ordered raw materials are in the desired quality in according to the requirement.
  7. Training our personnel and staffs in the matter of technical production and installation in order to assure of the quality finished products according to the requirement.
  8. Development of security management, occupational health and environment.

Milestone

1994
  • Crystal View was founded under the name "C.I. Aluminum Co., Ltd"
2002
  • Our first factory was built with 800 sq. m. area
2003
  • Our first aluminum casement window, the MP70 model, was designed and launched to the market.
2004
  • Our multipoint-lock aluminum casement window, the MP40 series was developed and received of positive feedbackfrom our customers.
2005
  • Our factory area was expanded to 1,600 sq. m.
 
  • We’re determined to build the Crystal View brand, after a while we’re agreed to established Crystal View Windows & Doors Co., Ltd., which has been the name of our company until present. The company developed the aluminum windows and door systems to meet with the economic situation then, as the result our several products are popular in this year including the MP30 casement window series and the ML768 sliding window series. We also designed CVP mosquito screen series for the premium houses. The MP80 window system series for 8-storey condominium was also designed and developed by our R&D team in this year.
2007
  • We have started to build the relationship with a leading Australian design and manufacturing company and we have imported the sliding window series, SY112 Lifestyle and it’s called 2” sliding frame a few years later.
2008
  • We continuously expanded our factory area for 1,600 sq. m., making the total area of 4,000 sq. m. It’s the right time to get start the production of window and door series. In the last quarter of the year, we have started the production of uPVC window and door systems
2009
  • We have installed the CNC machinery system for the improvement of our door and window manufacturing. It is clear that Crystal View has always been improving itself as well as the potential of its personnel with emphasizing on making them realize the importance of the quality products, machineries, before- and after- sales services in order to make the customers are satisfied in Crystal View's products and services the most.
2010
  • We are currently cooperating with the leading of aluminum windows and door design and manufacturing companies which are from four countries differently, Australia, Italy, Germany, and Belgium. In additional, our personnel and staffs have received trainings from both local institution and our partnerships for international software for aluminum, uPVC, and glasses optimization. Besides, we’re registering ISO2001:2008 to our management system in order to assure the customers our quality management systems and production activities which are under the ISO 9001:2008 requirement.
  • Participate in Architec Fair 2010.
2011
  • We have the new innovation of machine CNC " COMET T6" from Italy. To increase the production line.
  • Participate in Architec Fair 2011.
  • Participate in Buildtech Fair 2011 .
  • According to the flood situation in the this year. Our company be safe in this situation but we join to help the sufferer by donate the appliace.
2012
  • Participate in Architec Fair 2012.
2013
  • Starting the water tested after installation.
2014
  • Develop personnel to prepare for high-rise buildings.
2015-2018
  • Expansion of the plant to accommodate the production of the high-rise buildings.